House construction cost estimate

Floor area × cost per sq m, labor and materials, permits, contingency and payment by stage

Owner: [YOUR NAME]

Location of the lot: [ADDRESS]

House: [TYPE: BUNGALOW / TWO-STOREY, BEDROOMS]

1. The estimate

What Amount

Floor area [AREA] sq m

Construction cost per sq m (contractor's quote) ₱ [AMOUNT]

Construction = area × cost per sq m ₱ [AMOUNT]

of which materials ₱ [AMOUNT]

of which labor ₱ [AMOUNT]

Plans, permits and supervision ₱ [AMOUNT]

Contingency ₱ [AMOUNT]

Total to prepare ₱ [AMOUNT]

Cost per sq m with everything: ₱ [AMOUNT]. Average spending per month while building ([MONTHS] months): ₱ [AMOUNT].

2. Payment by stage

Stage Share Amount Paid

Mobilization, site clearing and layout 4% ₱ [AMOUNT] ☐

Excavation, footings and foundation 14% ₱ [AMOUNT] ☐

Columns, beams and slab 22% ₱ [AMOUNT] ☐

Walls (CHB) and plastering 14% ₱ [AMOUNT] ☐

Roof framing and roofing 12% ₱ [AMOUNT] ☐

Electrical and plumbing rough-in 10% ₱ [AMOUNT] ☐

Doors and windows 8% ₱ [AMOUNT] ☐

Tiles, ceiling, paint and fixtures 14% ₱ [AMOUNT] ☐

Clean-up and turnover 2% ₱ [AMOUNT] ☐

Construction total 100% ₱ [AMOUNT]

The shares are an example. Write the ones in your contract, and pay each stage only when it is done and checked.

3. Building permit checklist

Done To do

☐ Application for building permit on the prescribed form, with a description of the work (PD 1096, s. 302)

☐ Certified true copy of the title (TCT) of the lot; if you are not the owner, the owner's consent or lease (s. 302)

☐ Latest tax declaration and real property tax receipt of the lot

☐ Plans and specifications signed and sealed by a licensed architect or civil engineer: architectural, structural, electrical, plumbing (s. 302)

☐ Barangay clearance for the construction

☐ Bill of materials and cost estimate; structural computations if the Building Official asks

☐ Electrical, plumbing and other ancillary permits filed together with the building permit

☐ Contractor's licence (PCAB) and the construction contract, if you hire a contractor

4. Before signing with a contractor

Done To do

☐ Two or three written quotations for the same plans

☐ A contract with the scope, the materials, the price, the stages and the completion date

☐ Who buys the materials — and who keeps the receipts

☐ Retention: an amount kept until the house is turned over and checked

☐ Who gets the permits, and who pays for them

☐ Warranty for defects after turnover

The rules No one may build, alter, repair or demolish a building without first getting a building permit from the Building Official of the city or municipality (PD 1096, National Building Code, s. 301). The application needs a description of the work, a certified true copy of the lot's title (TCT), and plans and specifications by licensed professionals (PD 1096, s. 302). The cost per square meter is not set by any law: it depends on the design, finishes, location and contractor. The figures here are examples — get written quotations. Labor and materials split, plans and supervision, contingency: your choices, shown as percentages so you can match your contractor's breakdown.

An estimate, not engineering advice. The cost per sq m is an example, not a market price; the lot, furniture and appliances are not included. Checked 21 October 2026.